The John Hay Seniors learned first hand the pros and cons between the Design-Bid-Build and Design Build construction methodologies.  After an overview of both arrangements, four teams were created to construct a bridge out of toilet paper rolls, foam board, stryo foam blocks, tooth picks, scotch tape and wire, in an hour time limit! All teams also needed to draw their design to scale.  Two teams were the Design Builders and they were permitted to design and construct simultaneously.  The two Design-Bid-Build teams were only permitted to draw their bridge during the first 30-40 minutes.  A surprise was thrown into the mix because after 40 minutes, the two Design-Bid-Build teams had to trade designs and were required to construct the other team's design based on the drawings.  That caused some heartburn because the teams were really connected to their own drawings and wanted a chance to build to them.


Careful Construction of a Design
Build Team

All teams finished their bridge construction approximately the same time and each group had a chance to talk about the process.  Both Design Build teams were initially happy with their group, but soon realized that it was more difficult than they first thought.  As they were constructing, new ideas would be presented, but they could not always incorporate them because it didn't go with what was already built.  Constructing and doing the design at the same time added pressure to who was doing the drawing to make sure it matched what was built.


Design Bid Build Team Finishes Construction and
Even Runs a Load Test


Both Design-Bid-Build bridges were constructed very closely to the intent of the design, and both teams thought it was because their designs were superior.  These teams realized the importance of having someone who was familiar with the design participate in the construction process (as the mentor helping the drawing team moved to the constructing team).  They were frustrated that they couldn't make design changes even if they thought of something that would make an improvement.


James Threalkill, Sr. Director, Human Resources from Skanska was visiting from Nashville, Tennessee and he commended the students on their performance, skill set and teamwork.  In his six years of working with ACE students, he said the John Hay Seniors and the Cleveland program as a whole was one of the best.  He encouraged the students, with particular emphasis to the girls, to continue in the construction field.